Versions Compared
Version | Old Version 4 | New Version 5 |
---|---|---|
Changes made by | ||
Saved on |
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Subscribe to the SSDT Newsletter by clicking here. Your email will be added to a distribution list.
Article 1
Article 2
Useful links:
REDESIGN STATUS | |
---|---|
507525 Sites Live on Redesign | 200196 Total Wave 7 Sites |
17 Participating ITCs | 551543 Total Districts Participating |
Please view the Current List of Districts & Status to see a comprehensive list of school districts along with their ITC, implementation status and the wave they are scheduled to migrate from Classic to Redesign.
The following terminology is used to determine where in the implementation process the entity is currently at:
Implementing: The ITC is running test imports and balancing reports on the entity. The district and ITC are working to schedule dates to begin dual processing and go live.
Paralleling: The entity is inputting all production transactions into both Classic and Redesign.
Live: The entity is using Redesign for production processing; no parallel processing is being performed; Classic is available in 'read-only' mode.
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Save/Recall Feature Many canned reports have a Save/Recall feature that will allow you to create the setup of a report that you can use over and over again simply by using this Save and Recall option. The Save and Recall is available on all USAS-R Template Reports. Some of the USPS-R reports that offer this option are:
| ||||||||
Image RemovedImage Added