Versions Compared
Version | Old Version 8 | New Version 9 |
---|---|---|
Changes made by | Former user |
Former user |
Saved on |
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Subscribe to the SSDT Newsletter by clicking here. Your email will be added to a distribution list.
New Contracts
It is hard to believe , but the time is quickly approaching to start thinking about adding new contracts for next year. Listed below are three options that can be used to create new contracts contract compensations in USPS-R. This article is intended to provide general information about the new contracts options. Your ITC may have a custom checklist for creating new contracts so please contact them for specific details.
Creating Contract Compensations
The first option available is found under Processing/New Contracts. You are defaultedNew Contract Maintenance option
Under Processing>New Contracts, it defaults to the New Contract Maintenance tab. From here you can there, click on the Copy button . You need to find which displays the following window. Image Added
Query the Employee, choose the Compensation from the drop down and and select the Contract Type -'New Contract from the drop down and then ' and click Create. This It will then copy the individual employee Compensation into 's compensation and display it in the new contract window.After the contract is copied in, you can then modify
Image Added
Make any modifications and Save the contract information for the upcoming year-- .
- Job Calendar
- : will use days from the chosen calendar to determine how many work days will be defined for this Compensation
- Description:
- can be the title of the Position
- (i.e. 21-22 Teacher). Will default to what is currently listed as description
- Label:
- used if the position has more than one Compensation and can be used to differentiate between Compensations (example- 20-21 Teacher) The label is used for the description on the Pay Stubs.
- Compensation Start Date
- : start date of the current contract. This date is a required field and is usually the first day for which the job is paid.
- Compensation Stop Date
- : stop date of the current contract. (Remember if the employee is paid accrued wages through the summer to enter in a stop date of the ending date for the last pay for the contract) This date is a required field
- .
- Override Unit Amount Calculation: used if wanting to override the system generated unit amount calculation.
- Contract Work Days
- : calculated by using the Compensation Start and Stop dates and the Job Calendar selected
- Override Pay Per Period Calculation: used if wanting to override the system generated Pay Per Period amount calculation.
- Contract Amount: indicates where the compensation is placed on the salary schedule. This amount is for informational purposes. Amount and Obligation will differ when a change in the obligation is made (mid year)
- for the current contract through New Contract. In that case, the contract amount will be the full contract amount.
- Contract Obligation
- : the amount the board is obligated to pay the employee for the current contract,
- Pays in Contract
- : is the number of pays the job is contracted for,
- Stretch Pay: indicates whether the payments for the compensation should be stretched over the number of pays in the contract.)
Mass Copy Compensations option
The second option tab found in Processing/New Processing>New Contracts is Mass Copy Compensations. Select the Mass Copy Compensations tab. This will allow This option allows you to copy in specific Job job status positions as well as Select select specific pay groups that you want to pull into New Contract. There is an option to enter in the Contract Start Date as well as the Contract Stop date. If these are populated this , it will put those the dates directly into the Compensations that are copied to New Contract. You can then modify and Save save the remaining contract information for the upcoming year -- (Job Calendar, Description, Label, Contract Amount, Contract Obligation, Pays in Contract, Override Pay Per Period, Override Unit Amount.) Again, if desired the Override Pay Per Period Calculation and Override Unit Amount Calculation flags can be set.
Note-NOTE: The italicized headers fields above are fields that MUST be updated for the new contract for the upcoming year. It is very important that a contract Compensation Start Date and a Compensation Stop Date are entered for the appropriate calculation of Pay for the contract. If desired the Override Pay Per Period Calculation and Override Unit Amount Calculation flags can be set. This will ensure that the same Pay Per Period and the same Unit Amount are used during the payroll processing. If the flags are not set the system will calculate each pay and there could be a slight difference due to rounding in the amounts for Pay Per period or Unit Amount.
Image Added
Creating Contract Compensations - Import New Contracts
Image Added
The last option found under Processing/New Processing>New Contracts is Import New Contracts. This option will allow for a csv CSV file of new contracts, with the appropriate header information, for new contracts to be imported into New Contract. To create a template spreadsheet using the Compensations fields, which can assist in creating new contracts, you can import may use the - New Contract Compensation Worksheet.rpd-json file found in Redesign Shared Report/Report Definitions -- https://wiki.ssdt-ohio.org/pages/viewpage.action?pageId=82151184 into Reports. This file. This will allow you to create a template New Contract spreadsheet. After the spreadsheet has been created, you can sort to obtain specific Pay Groups and remove all others if desired, or you can also sort the entire spreadsheet on Compensation Start and Compensation Stop Dates and then remove any records that will not require a new contract for the upcoming year. With some manipulation performed on the spreadsheet, this will then allow you to update the data and create new contracts using the Import option in Processing/ New Processing>New Contracts.
The following fields are required to be on the csv CSV file for proper loading to take place in New Contract: contractType, employeeID, jobNo, newCompensation.label (Note- NOTE: Label is only required if the employee has more than one Compensation for a Position), contractAmount (required for stretch paid jobs), and contractualObligation (calculated for contracted jobs). See New Contract Documentation documentation for a complete listing of New Contract CSV header information- https://wiki.ssdt-ohio.org/display/uspsrdoc/New+Contracts
Once all new contracts have been added to the Processing/New Contract screen and Processing>New Contracts and since the new contracts have Start start dates that would be for the upcoming school year, the new contracts displayed on the grid can be Activated selected by clicking on the check box next to the employee(s) new contracts or if or, if you wish to select all employees, click the box under at the word Copy top and all records will be selected. You can also use the grid to filter for specific records and just select them. When all records are selected click the Activate button and selected, click Activate and the new contract compensations will be created. These compensations will not be paid on until the Compensation Start Date is within the period beginning and ending date for a payroll.
Image Added
Creating Non-Contract Compensations
The New Contract feature cannot be used for the creation of new Non-Contract Compensations. To create a Non-Contract Compensation csv CSV file, go to Reports/Report Reports>Report Manager and click Generate SSDT select the SSDT Non-Contract Compensation Mass Load Extract. Make any necessary updateschanges, deletions, etc. (verify headers for Mass Load Compensations-See the Mass Load#Compensation documentation for required headers for the csv file) and save the file in csv format.
With the appropriate header information defined the file can then be loaded directly into Compensations using the Mass Load/Compensation Load>Compensation feature. (csv CSV file example below)
Useful links:
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
REDESIGN STATUS | |
---|---|
348 Sites Live on Redesign | 198 Total Wave 7 Sites |
17 Participating ITCs | 538 Total Districts Participating |
Please view the Current List of Districts & Status to see a comprehensive list of school districts along with their ITC, implementation status and the wave they are scheduled to migrate from Classic to Redesign.
The following terminology is used to determine where in the implementation process the entity is currently at:
Implementing: The ITC is running test imports and balancing reports on the entity. The district and ITC are working to schedule dates to begin dual processing and go live.
Paralleling: The entity is inputting all production transactions into both Classic and Redesign.
Live: The entity is using Redesign for production processing; no parallel processing is being performed; Classic is available in 'read-only' mode.
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
SSDT is providing a pre-recorded session at the virtual OASBO Annual Conference (listed under the 'On Demand' sessions) called "Optimizing Business Practices with Redesign". Lots of good tips/tricks on grids, template report features, use of the activity ledger vs grids, explanation of 'outstanding' reports in USAS, use of templates in USPS-R. etc. |