Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

(tick) Subscribe to the SSDT Newsletter by clicking here.  Your email will be added to a distribution list.             


Article 1 - Wave Status Update (Michelle)



Article 2 - Voiding and Unvoiding USPS checks (Lori and Pat)





Useful links:


Did You Know?

Budget amounts for 2022 that were applied from the Proposed Amounts grid prior to the FYE Close will show as the Initial Budgets as soon as the posting period for July 2021 is opened!

USAS-R gives you two options for applying full year budget amounts - temporary and permanent. If a district chooses to start with a temporary budget, a permanent budget can be applied at any time during the fiscal year to replace the temporary figures.



REDESIGN STATUS

525

Sites Live on Redesign

196

Total Wave 7 Sites

17

Participating ITCs

543

Total Districts Participating


Please view the Current List of Districts & Status to see a comprehensive list of school districts along with their ITC, implementation status and the wave they are scheduled to migrate from Classic to Redesign.

The following terminology is used to determine where in the implementation process the entity is currently at:

  • Implementing: The ITC is running test imports and balancing reports on the entity.  The district and ITC are working to schedule dates to begin dual processing and go live.

  • Paralleling: The entity is inputting all production transactions into both Classic and Redesign.

  • Live: The entity is using Redesign for production processing; no parallel processing is being performed;  Classic is available in 'read-only' mode.


Did You Know?

Mass Load Future Pay Amounts - Lori


Did You Know?

Fund Changes 200 funds - Michelle





  • No labels